A bioprocess builder needed a single-use chromatography step turned into a buildable skid: a clear flow path, instrumentation and a layout that keeps the columns accessible for changeover.
What we did
P&ID / flow diagram covering columns, pumps and valves
Isometric layout with tubing routing and component placement
Instrumentation — conductivity, level, temperature and flow
Single-use bag and pinch-valve integration
The result
A coordinated skid package — flow diagram, isometrics and an instrument schedule — ready for fabrication and factory acceptance testing.
2 columnsParallel chromatography
SUSingle-use flow path
FAT-readyInstrument schedule
Let's talk about your project.
Tell us what you are trying to build, fix or understand. A few lines are enough.